Skip to content

Publications GAS TRADE: UNIT 27A (5th ed. pub. 2016)

Sorry, no image available for GAS TRADE: UNIT 27A (5th ed. pub. 2016)

GAS TRADE: UNIT 27A (5th ed. pub. 2016) - Commercial/Industrial appliances over 400 000 Btu/h (120 kW)

Publication Year:

  • 2016

Total Pages:

126

Publisher:

  • CSA
CSA Groupís 2015 Gas Trade materials reference the Red Seal Programís trade outlines for your preparation to become a nationally recognized gasfitter. Please visit the Red Seal Programís website for more details.


Unit 27A - Commercial/Industrial appliances over 400 000 Btu/h (120 kW)

Purpose:

The gas technician/fitter will encounter a variety of commercial and industrial equipment over 400 000 Btu/h (120 kW) for installation or start-up. When installing such equipment the technician/fitter must follow the CSA B149.1 Natural Gas and Propane Installation Code. Start-up procedures for equipment over 400 000 Btu/h (120 kW) are determined by the equipment itself and by the manufacturerís guidelines. It is important that the gas technician/fitter be familiar with these procedures, as well as with the special requirements for piping, ventilation, venting, water treatment, etc; and some key servicing and maintenance requirements of large installations.

Learning Objectives:

At the end of this unit you will be able to:

  • Describe gas piping requirements.

  • Describe ventilation and combustion air requirements.

  • Describe venting requirements.

  • Identify installation requirements.

  • Describe activation procedures for commercial/industrial appliances.

  • Describe servicing, maintenance, and troubleshooting procedures.

  • Identify water treatment requirements.


Publication type

Print Page

Tell a Friend

GST REG No R119441681
QST REG No R1006017360