Skip to content

Publications CAN/CSA-S269.3-M92 (R2013)

Sorry, no image available for CAN/CSA-S269.3-M92 (R2013)

CAN/CSA-S269.3-M92 (R2013) - Concrete Formwork

Publication Year:

  • 1992

Total Pages:

36

Reaffirmed Year:

  • 2013

Publisher:

  • CSA

What Others Bought

  • Sorry, no image available for S448.1-10

    Publications

    S448.1-10

    S448.1-10 - Repair of reinforced concrete in buildings and parking structures

  • Sorry, no image available for G30.18-09

    Publications

    G30.18-09

    G30.18-09 - Carbon steel bars for concrete reinforcement

  • Sorry, no image available for CAN/CSA-Z256-M87 (R2011)

    Publications

    CAN/CSA-Z256-M87 (R2011)

    CAN/CSA-Z256-M87 (R2011) - Safety Code for Material Hoists

  • Sorry, no image available for CAN/CSA-A23.3-04 (R2010)

    Publications

    CAN/CSA-A23.3-04 (R2010)

    CAN/CSA-A23.3-04 (R2010) - Design of Concrete Structures

  • Sorry, no image available for A23.1-09/A23.2-09

    Publications

    A23.1-09/A23.2-09

    A23.1-09/A23.2-09 - Concrete materials and methods of concrete construction/Test methods and standard practices for concrete

  • Sorry, no image available for S16-09

    Publications

    S16-09

    S16-09 - Design of steel structures

  • Sorry, no image available for CAN/CSA-S472-04 (R2009)

    Publications

    CAN/CSA-S472-04 (R2009)

    CAN/CSA-S472-04 (R2009) - Foundations

  • Sorry, no image available for Z797-09 (R2014)

    Publications

    Z797-09 (R2014)

    Z797-09 (R2014) - Code of practice for access scaffold

click to view next item

1. Scope

1.1
This Standard provides rules and requirements for the design, fabrication, erection, and use of concrete formwork which provide temporary lateral support or containment of freshly placed concrete for buildings and other structures during their construction, alteration, or repair. It is structured and organized so that it may be used with either working stress or limit states design standards and concepts.

Supplementary rules or requirements may be necessary for unusual types of formwork which
(a) are exposed to unusual environments or features;
(b) employ materials or procedures not covered in this Standard; or
(c) are intended to be used many times for precasting applications.

1.2
This Standard does not apply to
(a) falsework (including deck formwork);
(b) scaffolds;
(c) design of concrete structures; and
(d) chimney jump forms.

*For design of falsework see CSA Standard S269.1.

*For design of chimney jump forms see ACI Standard 307.

1.3
Support of formwork is covered in CSA Standard S269.1 and is not intended to be addressed in this Standard. Previously placed concrete should not be overloaded. Where previously placed concrete is used to support formwork, reshoring should be provided in accordance with Clause 7.2.11 of CSA Standard S269.1.

Publication type

GST REG No R119441681
QST REG No R1006017360